Sabtu, 05 Maret 2016

Boat Plans Aluminum


Today was spent filling in the gaps around the BHs. The first gaps to be filled were the ones in the notches between the chinelog and the BHs... the intrepid reader will remember I cut them too deep laterally. My wonderful wife who proved very adept at filling gaps around the stem went right to work on these notches, filling them with epoxy and shaping them with ply wrapped with packaging tape.


Once that was set, we glued on cedar spacers to fill the gaps between the bottom frame of the BHs and the bottom of the boat, which appeared because my notches in the BHs were too shallow, despite careful measuring. I didnt fool with cutting down the spacers before placing them, I glued them in place and Ill plane them down to match. I wanted to make sure to do the repair correctly rather than eyeball a piece that would look like it fit.



Finally, I glued together the two halves of the bottom. Very self explanatory. Shooting for gluing the bottom on Tuesday.





Do you find information about Boat Plans Aluminum are you looking for? If not, below may help you find more information about the Boat Plans Aluminum. Thank you for visiting, have a great day.

Related Posts by Categories

0 komentar:

Posting Komentar